Blog

The RHR team poured concrete bases and anchors for the first two rotating towers. Ray W2RE and Cal W1IZL getContinue Reading
The RHR team is now starting phase #2 in Eastport, ME. They surveyed the property for the first two rotatingContinue Reading
In April a storm ripped through the Northeast corner of Maine with winds in excess of 70mph. At both sitesContinue Reading
Its important to the RHR team to have station uptime and we strive to keep things running 24/7 but occasionalContinue Reading

February 26, 2016

What A Mess

On February 24th the Northeast experienced a violent storm that road the east coast creating high winds and T-storms. TheContinue Reading
In W2/Monticello we noticed the reflector on the Force 12 was getting close to touching a tree branch @ 60’.Continue Reading
On Jan 26th, Ray W2RE replaced a balun on a M2 3 element 40M yagi in 30mph winds in W2/Summit.Continue Reading
On Dec 13th the RHR team installed a quick and dirty 4SQ array in W1/Eastport for the low band DXContinue Reading
The RHR team built and installed two new antennas in W2/Quaker. We installed a 2el 30/40M combo and multi bandContinue Reading