W1/Calais Repairs and Upgrades

The Northeast USA was whacked by three consecutive Norā€™easter storms that destroyed the M2 Rotor at the Calais site. The RHR teamĀ upgraded the site with a GXP 7L-7B with new Yaesu 2800 and installed a high gain Ubiquity dish for reliable ISP.
Here is a few action photos: